Showing posts with label C.E.N. No. 01/2018. Show all posts
Showing posts with label C.E.N. No. 01/2018. Show all posts

Saturday 17 August 2019

Result , Assistant Loco Pilot, Cat. 2, C.E.N. No. 01/2018 ,after DV,rrb ahmedabad

rrb ahmedabad.Results,_ALPTech,CEN_012014_DV

Based on the Written Examination held on 15.06.2014, 13.07.2014 & 20.07.2014 followed by Verification of Documents and Genuineness of candidature from 26.10.2015 to 23.12.2015,
results were notified on 29/04/2016, 02/01/2017 and 17/01/2019.

The following candidate, whose Roll No. is given below, is found provisionally suitable for appointment. His name has been recommended to the General Manager, Western Railway,
Churchgate, Mumbai for further process of offering appointment.

OBC - 01 (One) Candidate
11415004102283 

FOR DETAILS CLICK;http://www.rrbahmedabad.gov.in/images/Results_ALP_Tech_CEN_012014_DV_Addl2.pdf

Result , Technician Grade III Blacksmith, Cat. No. 7., C.E.N. No. 01/2018 ,after DV.,Ahmedabad


Result , Technician Grade III Blacksmith, Cat. No. 7.,  C.E.N. No. 01/2018 ,after DV.,Ahmedabad

Panel of Technician Grade III Blacksmith, Cat. No. 7 against CEN No. 01/2018 

Based on the performance in 1st stage Computer Based Test (CBT) held from 09/08/2018 to 31/08/2018 and 04/09/2018, 2nd Stage CBT held from 21/01/2019 to 23/01/2019 and 08/02/2019, followed by Verification of Documents and medical examination from 20/06/2019 to 12/07/2019, no candidate is found suitable for the post of Technician Grade III Blacksmith, Cat. No. 7.

FOR MORE DETAILS CLICK;http://www.rrbahmedabad.gov.in/images/Results_ALP_Tech_CEN_012018_DV1.pdf
.
,

Labels